BackFitting-out
KCC 3F Control Room Renovation
- Client
- KCC
- Location
- Kowloon Bay
- Year
- 2022
- Category
- Fitting-out
Renovation of the operations control room on the 3rd floor of KCC — fit-out, AV and engineering services.
A control-room renovation at KCC level 3 including raised floor and ceiling rework, AV/security cabling, console joinery and uninterrupted handover.