Skip to content
HKP EngineeringHKP Engineering
Back

Fitting-out

KCC 3F Control Room Renovation

Client
KCC
Location
Kowloon Bay
Year
2022
Category
Fitting-out
KCC 3F Control Room Renovation

Renovation of the operations control room on the 3rd floor of KCC — fit-out, AV and engineering services.

A control-room renovation at KCC level 3 including raised floor and ceiling rework, AV/security cabling, console joinery and uninterrupted handover.